The Water Directory for 249,000 Global Buyers

Product and Services Finder

More

Water Research Library

Optimized Commissioning of Control Systems
Burkert Fluid Control Systems
When commissioning control systems, coordination problems between individual components occur quite frequently. Learn more about a new, integrated controller concept with pre-parameterized control systems and defined components that prevents these problems and ensures fast, seamless commissioning.
 
Aeration Blowers in the Wastewater Industry in North America
Aerzen USA Corp.
As the main consumer of electricity in a wastewater treatment plant, the aeration system weights most heavily on the costs of operation. Climatic changes, the 2007/08 rise in the costs of energy, and the public support for green initiatives have raised the level of awareness for our use of energy, and this has spread far beyond the circles of the environmentally concerned: energy efficiency has ...
 
NuAire | Cross contamination in a Biological Safety Cabinet
NuAire, Inc
Impact of Class II Biological Safety Cabinet Downflow Velocity on Cross Contamination Over the last several years, Biological Safety Cabinet (BSC) manufacturers have lowered downflow velocity while maintaining inflow velocity in an effort to increase energy efficiency, reduce exhaust system requirements and lower BSC Noise and vibration levels. However, the lowering of downflow velocity may come ...
 
Cooling Tower Zero Blowdown Technology
Cannon Water Technology Inc.
The Platinum-level USGBC LEED green building, Tempe Transportation Center, found they could not use the typical cooling tower blowdown due to high hardness and salinity of the Tempe city water supply. Read how implementing Zero Blowdown Technology as a solution achieved a 29% reduction in total system water use, at an average 31% thermal load. The Tempe Transportation Center, Tempe, AZ, ...
 
Paragould
Komline-Sanderson
Increased population in Paragould, Ark., forces city to expand wastewater treatment plant to better manage sludge disposal By Christopher L. Komline Does this sound familiar? Your lagoon is filling with both primary and secondary sludge, and will be at capacity within the next two years. Paragould,Ark., a growing city of 22,500 located in northeast Arkansas, had just that problem. Due to rapid ...
 

Make Confident
Buying Decisions

  • Search 101,953 Products
  • Compare Products
  • Get Pricing & Information
  • Download White Papers
  • Network With Other Buyers
Federal Equipment Company Company

Water Video

Collete High Shear Granulator Test Run - FEC 37832 Federal Equipment Company
 
Setting-up the date and time on a Burkert Type 8619 MultiCELL Controller Burkert Fluid Control Systems This brief video will walk you through the process of setting-up the date and time on a Burkert Type 8619 MultiCELL Controller
 

Water and Wastewater Direct Features

Chemineer Company
Cannon Water Technology Inc. Water
Copyright © 2014, Questex Media Group LLC
Company descriptions and contact information are quoted from the company's website or other promotional information. Questex is not responsible for the accuracy of this information. Unless specifically noted, Questex is not sponsored by, affiliated with or otherwise connected with any of the listed companies.